Phone:

(+98) 21 88375039-44

Location:

3rd Floor, No.1,Ario Bldg. North Falamak Ave. Phase 4, Shahrak-e-Qods Tehran, Iran.

Linkedin:

rosemond-group

The Company has been established in early of 2014 to construct the first GTL plant in Iran. Gas-to-liquids conversion enables the production of similar products as are presently produced from crude oil and is completely environmentally friendly. The plant capacity is 3000 bbl/day of different refinery products including LPG, Naphta, Diesel and Wax. Following activities for establishment of the plant is under progress:

  • Basic engineering & design with cooperation of RIPI (Research Institute Petroleum Industries)
  • Process simulation
  • Catalyst bulk production and test
  • Site mobilization in Qeshm Island
  • Detail engineering, procurement engineering and construction of the steam reformer