- Client:
- Engineering Contractor
- Date of Award:
- Location:
- Scope of Work
- Offshore Industries Co. (SAFF)
- Rosemond EMI Co.
- 2019
- Kharg Island, Iran
- Engineering & Project Management
The SUSTAINABLE ENVIRONMENTAL POLLUTION PREVENTION PLANT (SE3P) is a grass roots development to minimize flaring of associated gas produced from Kharg island onshore and offshore oil fields.
SAFF Company as the BOT Contractor for SE3P Project, awarded the Design, Engineering & Management of the project to Rosemond emi Co.
- Sea Water Intake Capacity: 36,000 m3/h
- Excavating work volume: 160,000 m3
- Concreting work volume: 9,000 m3
- Sea Water Lift Pump QTY.: 5+3 No.
- Total Depth: 12.45 m
- Hydro Mechanical Equipment (Primary & Secondary Screens, Stop Lugs, Gantry Cranes & Hypoclorite Injection System)