- Client:
- Contractor:
- Date of Award:
- Location:
- Iranian Offshore Oil Co. (IOOC)
- Sepehr Rosemond
- 2008
- Persian Gulf
Sepehr Rosemond was awarded the contract for installation of one 24" infield pipeline in Aboozar offshore oil field at Persian Gulf with 3.2 km. in length. The new 24" infield pipeline was to substitute the existing 24" pipeline between Aboozar AA production platform and Aboozar A9 wellhead platform. The pipeline was installed and completed with associated risers and tie-in spools at each platform.
- Risers design and engineering
- Installation engineering
- Laying subsea 24” oil pipeline with 3.2 km length
- 2*24” Risers fabrication & installation
- 2*24” Spool Pieces fabrication & installation
- commissioning