Rosemond Water Intake Project

  • Client:
  • Engineering Contractor
  • Date of Award:
  • Location:
  • Scope of Work
  • Offshore Industries Co. (SAFF)
  • Rosemond EMI Co.
  • 2019
  • Kharg Island, Iran
  • Design & Engineering

The SUSTAINABLE ENVIRONMENTAL POLLUTION PREVENTION PLANT (SE3P) is a grass roots development to minimize flaring of associated gas produced from Kharg island onshore and offshore oil fields.

SAFF Company as the BOT Contractor for SE3P Project, awarded the Design & Engineering activities of a T-Jetty & Export line Facilities to Rosemond emi Co.

  • Ships Capaity: Upto 50,000T DWT
  • Design Draft: 14.0 Meter
  • Operational Length:
  • T-head jetty Length:
  • Loading Facilities: 3 Loading Arms (C3, C4 & C5+)
  • Material Handlyng System: hypochlorite Sulphur granola Loading Facilities

Water Intake

Water Intake