The South Pars field is located in the Persian Gulf approximately 100 km south-west of Assaluyeh, and 175km West of Kish Island. The South Pars Oil Field Development will be executed in two phases; the First Phase will consist of up to 7 production wells and will utilize a dedicated floating Production Facility (FPSO). For Phase I, one Wellhead Platform will be installed. The following number of wells shall be foreseen:
- Production Well n° 7
- Water Injections Wells n° 2 (future)
- Spare Slots (for production) n° 3
- Client:
- Sub-Contractor:
- Date of Award:
- Fabrication Location:
- Petro Iran Co. SAFF
- Saff Rosemond
- 2009
- Bandar Abbas
Individual flow lines will transport reservoir fluids from each Christmas tree to a production manifold on Wellhead Platform and then to an export riser and hence via sub sea pipeline to an FPSO (Production Facilities), for stabilization, dewatering, desalting and finally to be exported via shuttle tankers. The design wellhead platform capacity will be 44,000 BLPD. The analysis of the profiles results that the design capacity is given by the production foreseen in August 2008 and corresponding to: Liquid Rate: 44,000 BFPD (35,000 bbl of oil and 9,000 of water). The EPC Contract of Offshore facilities of this phase have been awarded to SAFF as Contractor. SAFF has invited SAFF-ROSEMOND Engineering & Management Company for PMC of detail engineering services. SAFF-ROSEMOND performs PMC of the Detail Design Engineering of Offshore facilities of Oil Layer.
- Project Management Consultancy (PMC) for engineering services comprising of basic, detail & follow up engineering
- Preparing Jacket Installation Procedure
- Review & endorsement of the jacket lift & transportation analysis
- Rigging & Pad eye design
- Sea fastening design
- Pile drivability
- Installation aid MTO
- Installation drawings